Ridge Reno w/Pool
Exterior Before
Exterior After
Entry Before
Entry After
Dining Before
Dining After
Kitchen Before
Kitchen After
Breakfast Nook Before
Breakfast Nook After
Powder Room Before
Powder Room After
Fireplace Before
Fireplace After
Living Before
Living After
Master Bath Before
Master Bath After
Master Bath Before
Master Bath After
Pool Before
Pool Renovation
Pool After
Project Overview:
This complete renovation was done on a home built in 2006 and was completed in approximately 8 weeks. This home renovation, not only included the usual of upgrading the finishes and paint, but also included TOTAL remodels of kitchen and baths. The transformation in the before and after photos speak for themselves.
Remodel Features:
- Extension and refinishing of hardwood floors throughout first level
- Interior and exterior paint
- Replacement of old windows
- Addition of finish carpentry (window trim, board and batten, bookshelves, and barn doors)
- New carpet and tile
- New cabinetry in kitchen and baths, paint and hardware
- New updated light fixtures and outlets
- Removal of arched entryways and doors
- Update of living room fireplace
- New appliances
- Total master bath, powder room, and kitchen renovation (plulmbing and fixtures, countertops, tub/shower, sinks and toilets, cabinetry, hardware, etc.)
- Pool renovation with new filtration/pump system, conversion to salt water, and new tile/finish
- Landscaping and updated exterior finishes